| No | Deskripsi | Qty | Harga | Subtotal | Potongan | Total | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | Terop 6 lokal x 4 Hari | 24 | Rp 350.000 | Rp 8.400.000 | Rp 0 | Rp 8.400.000 | |
| 2 | LCD Proyektor 1 Unit x 4 Hari | 4 | Rp 300.000 | Rp 1.200.000 | Rp 0 | Rp 1.200.000 | |
| 3 | Bloking Kain 24 Meter x 4 Hari | 96 | Rp 20.000 | Rp 1.920.000 | Rp 0 | Rp 1.920.000 | |
| 4 | Terop (Tambahan di SMP) | 5 | Rp 350.000 | Rp 1.750.000 | Rp 0 | Rp 1.750.000 |
| Subtotal | Rp 13.270.000 |
|---|---|
| Potongan | Rp 0 |
| Total Invoice | Rp 13.270.000 |
| DP / Uang Muka | Rp 0 |
| Sisa Pembayaran | Rp 13.270.000 |